PROJECTS PORTFOLIO

 

PRIVATE RESIDENCE

Mercer Island, WA
2017

This project included painted soldier piles in 30" diameter shafts with treated lagging.  Existing retaining walls and drainage system were also improved during the course of construction.

HARBOR HILL DRIVE EXTENSION

Gig Harbor, WA
2017

For the City of Gig Harbor we installed 105 soldier piles, 5,800 square feet of lagging, 740 soil nails, and 9,800 square feet of shotcrete.

VERIZON CELL TOWER FOUNDATION

Centralia, WA
2017

This 8' diameter by 40' deep foundation was installed utilizing CMP, temporary casing, and a slurry system.

EMERGENCY SEWER REPAIR

Seattle, WA
2017

This project for the City of Seattle on Denny Way required installing a 7.5' x 10' temporary casing and a 6.5' x 10' permanent casing.

RETAINING WALL

Camano Island, WA
2018

This project was for a private community on Camano Island. 35 soldier piles and 3,300 SF of lagging were installed.

SUBSTATION, SWITCHYARD, TRANSMISSION

Northeast Oregon
2018

Installed 42"-96" diameter foundations, 13'-30' deep.

PSERN TOWER FOUNDATIONS

Skykomish, WA
2018

Installed four 5' x 26' drilled pier foundations for a Puget Sound Emergency Radio Network Tower.