PROJECTS PORTFOLIO

Projects: Projects

PRIVATE RESIDENCE

Mercer Island, WA
2017

This project included painted soldier piles in 30" diameter shafts with treated lagging.  Existing retaining walls and drainage system were also improved during the course of construction.

Schedule a Consultation

HARBOR HILL DRIVE EXTENSION

Gig Harbor, WA
2017

For the City of Gig Harbor we installed 105 soldier piles, 5,800 square feet of lagging, 740 soil nails, and 9,800 square feet of shotcrete.

Contact

VERIZON CELL TOWER FOUNDATION

Centralia, WA
2017

This 8' diameter by 40' deep foundation was installed utilizing CMP, temporary casing, and a slurry system.

Get In Touch

EMERGENCY SEWER REPAIR

Seattle, WA
2017

This project for the City of Seattle on Denny Way required installing a 7.5' x 10' temporary casing and a 6.5' x 10' permanent casing.

Schedule a Consultation

RETAINING WALL

Camano Island, WA
2018

This project was for a private community on Camano Island. 35 soldier piles and 3,300 SF of lagging were installed.

Get in Touch

SUBSTATION, SWITCHYARD, TRANSMISSION

Northeast Oregon
2018

Installed 42"-96" diameter foundations, 13'-30' deep.

Get in Touch

PSERN TOWER FOUNDATIONS

Skykomish, WA
2018

Installed four 5' x 26' drilled pier foundations for a Puget Sound Emergency Radio Network Tower.

Get in Touch